BIM Support for Sub Contractors

Post-Construction & As-Built BIM Support
As-Built Model & Drawing Updates

  • Update BIM models to LOD 500 As-Built based on:

  • Site markups

  • Redlines on shop drawings

  • Approved variations and field changes

  • Update as-built drawings (plans, sections, elevations) aligned with installed conditions

  • Ensure continuity between construction-stage BIM and final handover

  • documentation

COBie & Asset Data Integration

  • Integrate COBie and asset information from LOD 400 construction models

  • Validate equipment data, locations, and attributes

  • Deliver structured, reliable data for owner operations and facilitymanagement

What Contractors Gain with NodeX

  • Coordinated models and drawings that reflect buildable intent

  • Faster resolution of site issues and reduced RFIs

  • Clear builders’ work and penetration planning

  • Controlled transition from construction BIM to as-built BIM

  • A single digital ecosystem supporting construction, closeout, andhandover